Underground Reservoir - a time lapse
Final Steps |
The Westcon cement lid is lowered carefully onto the awaiting lower section. They must align perfectly to create a water tight seal. This is a skill in communication and takes a talented crane operator.
Hydrants |
The weight of the upper section compressed the mastic and makes a permanent seal. This particular tank is a 5,000 gal reservoir.
|
A hydrant installation on the outside of an existing structure. The site while in progress and again at completion.
Pumphouse and Stock Waterer Site